MP-34 Multi-Point Lifting Beam
34 Tonne Modular Multi-Point (Multi-Lug) Lifting System
The MP-34 is a higher-capacity multi-point lifting beam designed for more demanding lifting operations where increased working load limits and improved load control are required.
With a 34 tonne working load limit, it is well suited to structural steel handling, fabricated assemblies, and heavier components where stability across multiple lifting points is critical.

Key Specifications
Maximum Working Load Limit (WLL):
34 TonnesBeam Sections Available:
3m and 6mMaximum Combined Span:
Up to 12m (3m + 6m + 3m)Configurations:
Centre Point Lift
Spreader Beam Configuration
Semi-Spreader Configuration
Capacity varies depending on span and configuration. See load charts below.
Designed and Manufactured in the UK
Higher Capacity Multi-Point Lifting
With a 34 tonne working load limit, the MP-34 supports heavier lifting operations while maintaining controlled load distribution across multiple lifting points.

Adaptable Lifting Configurations
Can be arranged in centre point, spreader, or semi-spreader configurations to suit more complex rigging setups and lifting requirements.

Modular Beam Construction
Manufactured using 3m and 6m sections, allowing the beam to be assembled to suit the required span while maintaining structural performance.

How Multi-Point Lifting Works
The MP-34 builds on the flexibility of smaller beams in the range, providing increased lifting capacity for heavier loads while retaining modular configuration options.
By distributing load across multiple lifting points along the beam, forces are shared more evenly than in single-point lifting arrangements.
This becomes increasingly important when handling heavier or more complex loads, where stability and reduced localised stress are critical to safe lifting operations.
It is particularly suited to lifting applications where load control and stability are essential.
Lifting Configurations
The MP-34 can be configured to suit a wide range of lifting scenarios, from compact single-beam lifts to extended multi-section arrangements.
• Multiple lifting points improve load control for heavier and more complex lifts
• Suitable for varied rigging arrangements and lifting geometries
• Modular sections allow span adjustment to suit different applications

Centre Point Lift Configuration
In centre point configuration, the MP-34 is used as either a 3m or 6m beam and lifted from a single central top lifting point.
This configuration is commonly used for:
• Vertical lifts in fabrication environments
• Compact lifting arrangements
• Symmetrical load handling
• Mechanical installation operations
The MP-34 maintains its 34 tonne working load limit in centre point configuration within approved span parameters.
Spreader Beam Configuration
In spreader configuration the beam is lifted using angled top slings connected to lifting points along the beam, allowing the bottom lifting span to match the load being lifted.
Available span arrangements include:
3m
6m
3m + 6m (up to 9m span)
3m + 6m + 3m (up to 12m span)
This configuration is suitable for:
Structural steel components
Fabricated assemblies
Equipment frames
Large modular structures
Spreader beam arrangements help improve load stability and minimise bending stresses during lifting.
For spreader and semi-spreader configurations, header sling angles should not exceed 30° STV.
Semi-Spreader Configuration
The semi-spreader configuration provides additional flexibility when lifting geometry or site restrictions prevent a full spreader arrangement.
In this setup:
Top slings connect to offset lifting points
Loads can be supported at several points along the beam
Lifts can be carried out where headroom is restricted
This configuration is particularly useful when lifting long or irregular loads requiring controlled support across multiple lifting points.
Capacity & Configuration Overview
The MP-34 is designed for higher-capacity lifting operations, maintaining full working load limits across shorter spans while offering extended reach through modular beam combinations.
As span increases, working load limits reduce depending on configuration.
Single Beam (3m / 6m): up to 34 tonnes
Two Beam (3m + 6m / 9m span): up to 34 tonnes, reducing to 21 tonnes
Three Beam (3m + 6m + 3m / 12m span): up to 34 tonnes, reducing to 13 tonnes
This makes the MP-34 suitable for heavier lifting applications where both capacity and controlled load distribution are required.
Span & Load Capability
The MP-34 can be assembled in different configurations depending on the required span and lifting arrangement.
Load capacity varies based on setup, sling geometry, and the position of the bottom lifting points.
This allows lifting teams to manage heavier and more complex lifts while maintaining stability and control.
For spreader and semi-spreader configurations, header slings must not exceed 30° STV.
| Bottom span (m) | 0.5 | 1 | 1.5 | 2 | 2.5 | 3 | 3.5 | 4 | 4.5 | 5 | 5.5 | 6 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| WLL (tonnes) | 34 | 34 | 34 | 34 | 34 | 34 | 34 | 34 | 34 | 34 | 34 | 34 |
| Bottom span (m) | 0.5 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.5 | 34 | 34 | 34 | 34 | 34 | 34 | 34 | 27 | 24 | 21 | 19 | 16 | 13 |
| 1 | 34 | 34 | 34 | 34 | 34 | 34 | 34 | 27 | 24 | 21 | 19 | 16 | 13 |
| 2 | 34 | 34 | 34 | 34 | 34 | 34 | 34 | 29 | 27 | 24 | 21 | 19 | 16 |
| 3 | 34 | 34 | 34 | 34 | 34 | 34 | 34 | 29 | 27 | 24 | 21 | 19 | 16 |
| 4 | 34 | 34 | 34 | 34 | 34 | 34 | 34 | 29 | 29 | 27 | 24 | 21 | 19 |
| 5 | 34 | 34 | 34 | 34 | 34 | 34 | 34 | 29 | 29 | 27 | 24 | 21 | 19 |
| 6 | 34 | 34 | 34 | 34 | 34 | 34 | 34 | 34 | 34 | 29 | 27 | 24 | 21 |
| 7 | 27 | 27 | 29 | 29 | 29 | 29 | 34 | 34 | 34 | 29 | 27 | 24 | 21 |
| 8 | 24 | 24 | 27 | 27 | 29 | 29 | 34 | 34 | 34 | 31 | 29 | 27 | 24 |
| 9 | 21 | 21 | 24 | 24 | 27 | 27 | 29 | 29 | 31 | 34 | 32 | 29 | 27 |
| 10 | 19 | 19 | 21 | 21 | 24 | 24 | 27 | 27 | 29 | 32 | 34 | 32 | 29 |
| 11 | 16 | 16 | 19 | 19 | 21 | 21 | 24 | 24 | 27 | 29 | 32 | 34 | 32 |
| 12 | 13 | 13 | 16 | 16 | 19 | 19 | 21 | 21 | 24 | 27 | 29 | 32 | 34 |
Need a specific rigging arrangement checked? Contact our technical department for configuration support and documentation.
Typical Applications
The MP-34 Multi-Point Lifting Beam is commonly used for:
• Structural steel handling and installation
• Modular assemblies and fabricated sections
• Heavier engineering lifts
• Offshore and energy sector applications
• Larger or more complex components requiring multiple lifting points
It is particularly suited where loads need to be supported across multiple pick points to maintain stability throughout the lift.
Explore the Multi-Point Lifting Beam Range
Get a Quote
If your project requires a 34 tonne multi-point lifting beam with configurable spans up to 12 metres, the MP-34 provides a controlled and adaptable lifting solution.
Contact our team to confirm configuration, capacity, and suitability for your lifting requirements.
Frequently Asked Questions (FAQ)
The MP-34 is used for lifting operations where higher capacity and multiple lifting points are required to improve stability, reduce stress, and maintain control.
Yes. The MP-34 supports loads across multiple lifting points, making it suitable for loads with uneven or offset characteristics.
The MP-34 can be used in centre point, spreader, and semi-spreader configurations depending on the lifting requirement.
The MP-34 has a maximum working load limit of 34 tonnes
Yes. The MP-34 is built using modular 3m and 6m sections, allowing flexible span arrangements.