MP-300 | Heavy-Lift Multi-Point System

300 Tonne Multi-Point Lifting Beam

300 Tonne Multi-Point Lifting Beam

A heavy-lift 10 metre Multi-Point Lifting Beam for demanding operations requiring controlled load distribution at capacities up to 300 tonnes.

Heavy-Lift Multi-Point System
Single 10m beam Multiple lower lifting points 3 lifting arrangements
Request a Quote →
Heavy-lift model overview

What is the MP-300?

The MP-300 is a 10m heavy-lift Multi-Point Lifting Beam rated up to 300 tonnes across its standard load chart. It is intended for demanding lifting operations requiring high-capacity load distribution, with non-standard load configurations reviewed by the Multisec Technical Department.

Heavy-lift beam configuration

10m heavy-lift Multi-Point Beam

The MP-300 is a purpose-designed 10m heavy-lift beam for specialist lifting operations requiring very high capacity and controlled support across multiple lifting points.

10m

MP-300 Heavy-Lift Beam

300 tonnes WLL

The standard MP-300 load chart lists 300 tonnes Working Load Limit across the displayed bottom spans from 1m to 10m.

View applicable load chart ↓
For load configurations outside the current standard data, contact the Multisec Technical Department before beam selection.
Select the lifting configuration

One system. Three lifting arrangements.

Centre Point Lift

Centre Point Lift

The MP-300 is a 10m heavy-lift Multi-Point Beam for specialist lifting operations requiring high-capacity load distribution across multiple lifting points.

  • 10m heavy-lift beam
  • 300 tonne standard load chart
  • Multiple lower lifting points

Final lifting geometry should be checked against the current MP-300 technical data before use.

Spreader Beam Configuration

Spreader Beam Configuration

The MP-300 can be used in spreader arrangements where the approved lifting geometry is covered by the current technical data.

  • High-capacity load distribution
  • Controlled lifting across the load
  • Technical review for other load configurations

For spreader configurations, header slings must not exceed 30° STV. Other load configurations should be referred to the Multisec Technical Department.

Semi-Spreader Configuration

Semi-Spreader Configuration

Semi-Spreader arrangements provide flexibility for specialist heavy-lift geometry where multiple lifting points or offset support are required.

  • Flexible multi-point support
  • Specialist heavy-lift applications
  • Technical review where required

For semi-spreader configurations, header slings must not exceed 30° STV. Other load configurations should be referred to the Multisec Technical Department.

Capacity & configuration

MP-300 capacity & configuration

Use the model-specific load charts below to confirm the allowable capacity for the selected heavy-lift beam option, span and lifting arrangement.

300 tonne Working Load Limit across the standard load chart.

10m heavy-lift beam.

The standard load chart covers bottom spans from 1m to 10m at 300t WLL.

Centre Point, Spreader Beam and Semi-Spreader lifting arrangements are supported by the product family.

For Spreader and Semi-Spreader configurations, header slings must not exceed 30° STV.

For other load configurations, contact the Multisec Technical Department.

Standard forklift pockets aid handling.

Select a configuration to view the applicable load data.
Swipe horizontally to view the full load chart →
Bottom span (m)12345678910
WLL (tonnes)300300300300300300300300300300

For spreader and semi-spreader configurations, header slings must not exceed 30° STV. For other load configurations, contact the Multisec Technical Department.

Not sure which configuration you need? Speak to our technical team →
MP-300 lifting application
Engineered for complex lifting operations

Typical applications

  • Heavy engineered structures
  • Large fabricated assemblies
  • Offshore and energy lifting projects
  • Infrastructure and industrial heavy lifts
  • Complex high-capacity lifting operations
Request a quote

Discuss your MP-300 requirement

Discuss your MP-300 lifting requirement with the Multisec Technical Department. Other load configurations should be reviewed against the current technical documentation.

Speak directly to our team+44 (0)1642 240 672
Quotation request forMP-300 Multi-Point Lifting Beam
Technical support

MP-300 FAQs

What is the maximum working load of the MP-300?

The MP-300 is rated to 300 tonnes maximum Working Load Limit. Allowable capacity may reduce depending on the selected span and lifting configuration.

What lifting configurations can be used?

Centre Point Lift, Spreader Beam Configuration, Semi-Spreader Beam Configuration.

What span or size is available?

The MP-300 is available up to 10m beam. Allowable capacity depends on the selected span and lifting configuration.

What is the standard beam length of the MP-300?

The MP-300 is a 10m heavy-lift Multi-Point Beam with a 300 tonne standard load chart across the displayed bottom spans from 1m to 10m.

When should an MP-300 arrangement be referred to the technical team?

For load configurations outside the current standard data, contact the Multisec Technical Department before beam selection.

How do I select the correct configuration?

Selection depends on the load, lifting points, span, headroom and rigging arrangement. Discuss the lift with the Multisec team where the configuration is not already covered by the current technical documentation.

Multisec
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.