MP-50 | Modular Multi-Lug System

50 Tonne Multi-Point Lifting Beam

50 Tonne Multi-Point Lifting Beam

A 50 tonne modular multi-point lifting beam for demanding lifting operations requiring greater capacity and controlled support across multiple lifting points.

Modular Multi-Point System
3m and 6m modular sections Multiple lower lifting points 3 lifting arrangements
Request a Quote →
MP-50 Multi-Point Lifting Beam product render
Model overview

What is the MP-50?

The MP-50 combines a 50 tonne maximum working load with 3m and 6m modular beam sections and arrangements up to 12m. It is designed for higher-capacity Centre Point, Spreader and Semi-Spreader lifts where controlled support across multiple lifting points is required.

Build the beam. Choose the lift.

Configure the required span

For the modular MP-50, 3m and 6m beam sections can be assembled into different standard span arrangements. Capacity depends on the selected arrangement and lifting geometry.

01

Single Beam

3m or 6m single-beam arrangement — 50t WLL.

02

Two Beam Assembly

3m + 6m arrangement — 9m span, 50t to 32t depending on configuration.

03

Three Beam Assembly

3m + 6m + 3m arrangement — 12m span, 50t to 20t depending on configuration.

Select the lifting configuration

One system. Three lifting arrangements.

Centre Point Lift Configuration

Centre Point Lift Configuration

A single central top lifting point is used for compact vertical lifts where the available lifting geometry is straightforward and headroom is limited.

  • Compact lifts
  • Restricted headroom environments
  • Controlled symmetrical handling

This arrangement is typically chosen where a single central top connection suits the load and the lift geometry.

Spreader Beam Configuration

Spreader Beam Configuration

Angled top slings connect to the upper lifting points, creating a spreader arrangement for controlled two-point lifting across the load.

  • Improved load stability
  • Reduced bending forces
  • Suitable for longer spans

This arrangement is selected where controlled support across two primary lift points is required.

Semi-Spreader Configuration

Semi-Spreader Configuration

The semi-spreader arrangement adds flexibility where lifting geometry or headroom constraints make a traditional spreader less suitable.

  • Offset top lifting points
  • Flexible multi-point support
  • Useful in restricted spaces

This arrangement helps match the beam to more complex rigging requirements.

Capacity & configuration

MP-50 capacity & configuration

Use the information below to compare the standard beam arrangements, spans and lifting configurations available for the MP-50. Allowable capacity depends on the selected arrangement and lifting geometry.

✓

50 tonne maximum Working Load Limit. 3m beam section weight: 1,500 kg. 6m beam section weight: 2,622 kg. Top Central: 55t Bow Shackle. Top Outer: 35t Bow Shackle. Bottom Central: 55t Bow Shackle. Bottom Outer: 25t Bow Shackle. Single 3m and 6m beam arrangements provide 50t WLL. 9m two-beam arrangement provides 50t to 32t depending on configuration. 12m three-beam arrangement provides 50t to 20t depending on configuration. Centre Point, Spreader Beam and Semi-Spreader configurations available. For Spreader and Semi-Spreader configurations, header slings must not exceed 30° STV.

Select a configuration to view the applicable load data.
Swipe horizontally to view the full load chart →
Bottom span (m) 0.511.522.533.544.555.56
WLL (tonnes) 505050505050505050505050
Swipe horizontally to view the full load chart →
Top span (m) 0.5123456789101112
0.5 50505050505050403632282420
1 50505050505050403632282420
2 50505050505050444036322824
3 50505050505050444036322824
4 50505050505050444440363228
5 50505050505050444440363228
6 50505050505050505044403632
7 40404444444450505044403632
8 36364040444450505046444036
9 32323636404044444650484440
10 28283232363640404448504844
11 24242828323236364044485048
12 20202424282832323640404850

For spreader and semi-spreader configurations, header sling angles must not exceed 30° STV.

Not sure which configuration you need? Speak to our technical team →
MP-50 lifting application
Engineered for complex lifting operations

Typical applications

  • Structural steel installation
  • Heavy fabricated assemblies
  • Large engineering components
  • Offshore and energy sector lifts
  • Complex lifting operations requiring multiple lifting points
Request a quote

Discuss your MP-50 requirement

Discuss your MP-50 lifting requirement with the Multisec team to confirm the correct span, lifting arrangement and allowable capacity.

Speak directly to our team+44 (0)1642 240 672
Project quotation request forMP-50 Multi-Point Lifting Beam
Contact detailsYour details
Lift requirementSpecify the liftGive us what you know. Leave anything you are unsure about blank and our engineering team can advise.
Project informationAnything else we should know?Add dimensions, headroom, centre of gravity, site constraints or certification requirements if relevant.
Technical support

MP-50 FAQs

What is the maximum working load of the MP-50?

The MP-50 is rated to 50 tonnes maximum Working Load Limit. Allowable capacity may reduce depending on the selected span and lifting configuration.

What lifting configurations can be used?

Centre Point Lift, Spreader Beam Configuration, Semi-Spreader Beam Configuration.

What span or size is available?

The MP-50 is available up to 12m (3m + 6m + 3m). Allowable capacity depends on the selected span and lifting configuration.

Can the MP-50 be configured to 12m?

Yes. The modular MP-50 can use a 3m + 6m + 3m arrangement to provide a 12m beam configuration. The allowable load depends on the selected top span, bottom span and lifting arrangement, so the applicable load chart must be checked.

Does the MP-50 maintain full WLL at every span?

No. Full Working Load Limit is available in the standard shorter-span arrangements, but allowable capacity reduces in some extended Spreader and Semi-Spreader configurations. Use the load charts above to check the required lifting geometry.

How do I select the correct configuration?

Selection depends on the load, lifting points, span, headroom and rigging arrangement. Discuss the lift with the Multisec team where you need help confirming the correct configuration.

Before you go... Download the Multisec Brochure

Multisec Brochure Download
Multisec
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.