MP-100 Multi-Point Lifting Beam

100 Tonne Multi-Point Lifting Beam for Medium-to-Heavy Lifts

The MP-100 is a high-capacity multi-point lifting beam designed for heavy lifting operations where increased working load limits and simplified configurations are required.

With a 100 tonne working load limit, it is suited to large structural components, heavy fabrications, and engineering lifts where controlled load distribution across multiple lifting points is essential.

MP-100 Multi-Point Lifting Beam

Key Specifications

  • Maximum Working Load Limit (WLL):
    100 Tonnes
  • Beam Length Options:
    6m and 11.5m
  • Beam Type:
    Single beam (non-modular configuration)
  • Lifting Points:
    Multiple bottom lifting lugs for load distribution
  • Configurations:
    Centre Point Lift
    Spreader Beam Configuration
    Semi-Spreader Configuration
  • Design Standard:
    Engineered in accordance with DNV-ST-0378 and BS EN 13155
  • Certification:
    Supplied with certification and full traceability

Capacity varies depending on span and configuration. See load charts below.

Designed and Manufactured in the UK

Multi-Lug Load Control

Multiple lifting lugs allow loads to be supported across several pick points, improving stability and reducing stress on the load.

placeholder

Flexible Lifting Configurations

Can be configured as a centre point, spreader, or semi-spreader beam to suit different lifting scenarios.

placeholder

Modular Beam Design

Built using 3m and 6m sections, enabling flexible span configurations while maintaining strength and performance.

placeholder

How Multi-Point Lifting Works

The MP-100 is designed for high-capacity lifting where simplicity and reliability are critical.

By distributing load across multiple lifting points along the beam, forces are shared more evenly compared to single-point lifting arrangements.

This improves stability, reduces localised stress, and provides greater control when handling heavier or more complex loads.

The result is a safer and more efficient lifting operation, particularly where large components must be lifted with precision.

MP-100 Lifting Configurations

The MP-100 is configured as a single beam and can be used across different lifting setups depending on rigging requirements and site conditions.

  • Multiple lifting points improve load stability and control
  • Suitable for heavy lifts requiring consistent load distribution
  • Available in different beam lengths to suit lifting requirement.
Centre Point Lift Configuration

In centre point configuration, the MP-100 is lifted from a single central top lifting point using a crane hook or master link.

This setup is typically used for:

• Controlled vertical lifts
• Heavy components with symmetrical load distribution
• Installation and fabrication operations

Multiple lower lifting lugs allow the load to be supported evenly across the beam.

The MP-100 maintains its full 100 tonne working load limit in centre point configuration when used within approved lifting parameters.

In spreader configuration, angled top slings connect to designated top lifting points, allowing the beam to match the required bottom span.

This enables loads to be lifted from two primary lifting points, improving stability and reducing bending forces compared to single-point lifting arrangements.

This configuration is commonly used for:

• Structural steel lifts
• Large fabricated assemblies
• Modular and engineered components

For spreader configurations, header sling angles must not exceed 30° STV.

Semi-spreader configuration combines aspects of both centre point and spreader lifting.

This arrangement is used where headroom restrictions or rigging constraints require a more adaptable setup while still benefiting from distributed load handling.

For semi-spreader configurations, header sling angles must not exceed 30° STV.

multi-point lifting beams configurations

Capacity & Configuration Overview

The MP-100 is designed for high-capacity lifting operations where consistent performance and simplified configuration are required.

Unlike smaller beams in the range, the MP-100 maintains its full working load limit across its available beam lengths, without the need for modular combinations.

Standard beam configurations include:

  • 6 metre beam — up to 100 tonnes
  • 11.5 metre beam — up to 100 tonnes

Both configurations maintain full capacity when used within approved lifting arrangements, providing flexibility in reach without reducing lifting capability.

This makes the MP-100 particularly suited to heavy lifting operations where maximum working load must be maintained while adapting to different lifting spans.

Span & Load Capability

The tables below show the MP-100 working load limits (WLL) across its available beam lengths and lifting configurations. Use these charts to determine allowable loads based on span, rigging arrangement, and load distribution. For Spreader & Semi-Spreader configurations, header slings must not exceed 30° STV.

MP-100 – 6m Load Chart
Top lifting centreAll lifting centres
Bottom span (m)12345678910
WLL (tonnes)100100100100100100100100100100
MP-100 – 11.5m Centre Point Configuration
Bottom span (m)1.52.53.54.55.56.57.58.59.510.511.5
WLL (tonnes)1001001001001001007565575245
MP-100 – 11.5m Spreader Configuration
Span (m)1.52.53.54.55.56.57.58.59.510.511.5
WLL (tonnes)100100100100100100100100100100100
MP-100 – 11.5m Semi-Spreader Configuration
Bottom span (m)1.52.53.54.55.56.57.58.59.510.511.5
WLL (tonnes)100100100100100958065555545

Need a specific rigging arrangement checked? Contact our technical department for configuration support and documentation.

Typical Applications

The MP-100 Multi-Point Lifting Beam is designed for high-capacity lifting operations where controlled load distribution and stability are critical.

Typical applications include:

• Heavy structural steel lifting and installation
• Large fabricated assemblies and modules
• Industrial plant and equipment installation
• Offshore and energy sector lifting operations
• Heavy engineering projects requiring multiple lifting points

It is particularly suited to lifts where higher working load limits are required while maintaining control across several pick points.

Get a Quote

If your project requires a high-capacity multi-point lifting beam with consistent performance and simplified configuration, the MP-100 provides a reliable and engineered lifting solution.

With a 100 tonne working load limit and multiple lifting configurations, it is suited to demanding lifting operations where control, stability, and capacity are critical.

Speak to our team to confirm beam selection, configuration, and suitability for your lifting requirements.

Frequently Asked Questions (FAQ)

The MP-100 is used for high-capacity lifting operations where loads need to be supported across multiple lifting points. It is commonly used for heavy structural components, large fabricated assemblies, and industrial lifting projects.

No. The MP-100 maintains its full 100 tonne working load limit across both standard beam lengths when used within approved lifting configurations. This differs from modular multi-section beams where capacity reduces as span increases.

The MP-100 is available as a 6 metre beam and an 11.5 metre beam. Both configurations are designed to maintain consistent lifting performance without the need for modular assembly.

Yes. The MP-100 can be used in centre point, spreader, and semi-spreader configurations depending on the lifting requirements and rigging setup.

The MP-100 is a higher-capacity, single-beam lifting solution designed for heavier lifts and simplified setup. The MP-50 is a modular system that offers more flexibility in span but with varying capacity depending on configuration.

The MP-100 has a maximum working load limit (WLL) of 100 tonnes when used within approved lifting configurations.

Lifting performance depends on rigging arrangement, sling geometry, load distribution, and the position of lifting points. Correct setup is essential to ensure safe operation within rated limits.

Yes. For spreader and semi-spreader configurations, header sling angles must not exceed 30° STV.

Yes. The MP-100 is designed for demanding environments such as offshore, energy, and heavy engineering projects where high-capacity lifting and controlled load distribution are required.

Request A Quote

Multisec
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.