Multisec news & projects
Multisec Beams in Action at the Port of Tyne
Multisec modular spreader beams have been supporting lifting operations at the Port of Tyne, handling heavy 40ft flat racks arriving on container vessels.

Heavy flat rack loads arriving on container vessels.
Application Port & Vessel OperationsHeavy load handling at the Port of Tyne.
Equipment Modular Spreader BeamsMultisec equipment supporting the lifting arrangement.
The OperationSupporting a busy period of lifting operations.
Following a busy period at the Port of Tyne, Multisec modular spreader beams were recently used to support the handling of heavy 40ft flat racks from container vessels.
The flat rack loads were too heavy for the vessel’s normal container crane arrangement, creating a requirement for additional lifting equipment capable of supporting the operation.
Multisec spreader beams provided the lifting team with a suitable solution, helping them safely handle the heavier loads as part of the vessel operations.
Applications such as this demonstrate one of the key advantages of modular lifting equipment: the ability to create practical lifting arrangements for changing load, span and project requirements.
Customer FeedbackBehind the Equipment“We are very happy with the new equipment, in fact couldn’t be happier.”
“All very well fabricated and we would just like to thank every part of your team who is involved in the whole process.”
“Next time we want beams, we know who to come to! Excellent equipment, thank you!”
Feedback from Port of Tyne
One beam.
One complete team.
Feedback like this means a great deal because every Multisec system is supported by people working across the entire process.
From the initial lifting requirement through to the equipment leaving our facility, each stage brings together the work of our design, manufacturing and supply teams.
01Design
Reviewing the lifting requirement and identifying the appropriate equipment and configuration.
02Fabrication
Manufacturing lifting equipment for demanding industrial and heavy lifting environments.
03Inspection
Equipment checked and prepared before leaving our facility for the customer.
04Dispatch
Coordinating the final equipment supply and getting the system where it needs to be.
Proven in the FieldBuilt for real lifting operations.
Seeing Multisec equipment performing on real lifting operations is always something we’re proud of.
Port environments demand lifting equipment that can support changing operational requirements, challenging loads and carefully planned lifting arrangements.
The successful use of these beams at the Port of Tyne is another example of Multisec equipment being put to work where it matters.
Thank you to the team at Port of Tyne for the kind words, the photographs and for choosing Multisec.
Explore the RangeMultisec Modular Spreader Beams
Modular lifting systems for projects across ports, marine, offshore, infrastructure and heavy industry.
View Modular Spreader Beams
Engineering Support
Let’s discuss your next lifting project.
Send us your load, span, lifting-point arrangement and any drawings. Our team can review the requirement and discuss a suitable Multisec solution.
Discuss Your ProjectDiscuss your project
Have a lifting requirement?
Send the load, span, lifting points and any drawings to help our team review your enquiry.